JEF meeting, January 10, 2025

From GlueXWiki
Revision as of 09:18, 10 January 2025 by Somov (Talk | contribs) (Agenda)

Jump to: navigation, search

Connection

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

-New PCB and parts for the LMS light source arrived to the lab. The LMS board will be assembled and tested during next week.
-Consider to install two more temperature sensors (will try to fix the old ones first), a few sensors have been ordered

-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [1]
- Initial version of the VTP firmware ready. Started testing using a setup with one VTP during the holiday break (some progress has been made)
- VTPs installed on all ECAL VXS crates [2]
- Use new version of DAQ, VTP included as a DAQ component. Will be updated on the entire detector after the ECAL commissioning
  • ECAL HV interlock check [3]
-Replace one HV module (problems with the interlock) [9]
  • Update signal translation table [10]
  • Update mapping of the ECAL high voltages and spare HV cables [11]
  • Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
  • Toook cosmic data with the whole detector powered [12]
  • Temperature of the ECAL modules
Previous temperature scan in the ECAL divider region [13][14][15]/4321188[16]

ECAL commissioning -- Sasha, All

Calibrations

  • Gain calibration
  • Low-level timing
  • Timing with respect to other detectors

Analysis/Simulation

Restoring PS test setup' [17]


Safety documents and preparing for the run

Page for shift Takers
ECAL in the Experimental Safety Assessment Document (ESAD)
EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)