Controls Meeting 5-Dec-2024

From GlueXWiki
Revision as of 12:28, 20 November 2024 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status ** PXI controller reboot (Brian) ** PXI ADC calibrations (Brian) ** Alarm settings for PXI status PVs (Brian) <br> File:SolenoidAlarmsPXI....")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status
    • PXI controller reboot (Brian)
    • PXI ADC calibrations (Brian)
    • Alarm settings for PXI status PVs (Brian)
      SolenoidAlarmsPXI.png
    • Cooldown progress (Josh)
  • PLC developments (Bobby, Josh)
    1. Status of the new temperature sensors
    2. RTDs near ECAL and the voltage interlock
    3. Fan status and the voltage interlock
    4. ECAL HV crate resets
    5. Alarms for PLC-based PVs
  • ECAL and FCAL voltage controls (Hovanes)
  • Other items


Time/Location

10:15am Thursday 5-Dec-2024