ECAL Commissioning

From GlueXWiki
Revision as of 15:05, 16 September 2024 by Somov (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


  • DAQ configuration [1]
  • Tests with the LMS
  • Cosmic tests
initial gain calibration
  • HV settings