  1. Initial ECAL gain calibration using Compton scattering events
  • run at small small photon flux; use low-energy TAGH counters to constrain the total energy
  • Run conditions:
- amorphous radiator 10-4 R.L., 100 nA beam current
- ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
- run duration (TBD)