PS Test Stand Setup (March 2023)
Top view of black-tedlar wrapping
Bottom view of black-tedlar wrapping
Top waveguides wrapped in tedlar
Bottom waveguides wrapped in tedlar
Data Streaming
The way the mini BCAL is set up Sector 3 (index from 1) is hit the most that can be seen from the Scalars