Run Planning Meeting Notes, February 2 - February 9, 2023
From GlueXWiki
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Tuesday February 7
Past 24 hours
- Hall D dipole magnet fixed. Wire scans. Production running.
- ABU ~??h .
Shift Reports
- No Day shift summary
- Swing shift summary
- Owl shift summary
- [ Early Riser shift summary]
Reports
- Wire scans extrapolation (Hovanes).
- Solenoid Power Supply LCW temperatures (Tim).
- Tagger Magnet NMR and temperature relationship (Tim).
- Tagger Magnet LCW temperature change minimal over past 6 months (Tim).
- Calorimeter prototype installed on the PS test setup (Sasha).
- GlueX Statistics
- PARA 0/90: 16%
- PERP 0/90: 19%
- PARA 45/135: 20%
- PERP 45/135: 19%
- AMO : 25%
Issues
TPOL hole is back (Hovanes)
Pending:
- Issues with the TAGH HV module (Sasha) - Need to replace the board in this slot again, access on Tuesday may not be possible.
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- High current test without RADCON ??
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Monday February 6
Past 72 hours
- Fixed PSPEC power supply. Production data taking. Dipole magnet failure in the accelerator resulting in shift cancelations.
- ABU ~15.5 h .
Shift Reports
Friday
Saturday
Reports
- PSPEC power supply fixed (Scot).
- Pair Spec Magnet Power Supply Cooling Water Flow (Tim).
- CDC currents during the high intensity scan (Naomi).
- DIRC South OB humidity tripped interlock (Justin).
- DIRC nitrogen flow alarm tripped frequently (Hao Li).
- Target Overtemperature (Chris, Tim).
- FCAL HV scan results of 29/01/2023 (Igal).
- GlueX Statistics
- PARA 0/90: 17%
- PERP 0/90: 19%
- PARA 45/135: 20%
- PERP 45/135: 19%
- AMO : 25%
Issues
- MSTB5C (Hall D dipole) Tripped off , MTSB5C Status - Accelerator needs to fix the magnet .
Pending:
- Issues with the TAGH HV module (Sasha) - Need to replace the board in this slot again, probably Tuesday.
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
Plans
- Wait for the magnet fix. Go to beam permit today.
- High intensity running ???.
- RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
Friday February 3
Past 24 hours
- Recovery from maintenance day. A couple of production runs. PSPEC troubleshooting. Test runs.
- ABU ~9.6h .
Shift Reports
Reports
- Power supply trip (Tim, Scot).
- PS magnet at 800A (Eugene).
- ALERT to shift leader: two TAGM columns still at operating Vbias (Richard).
- Current scan to 950nA (Lubomir)
- PSPEC current scan (Sasha)
- GlueX Statistics
- PARA 0/90: 16%
- PERP 0/90: 19%
- PARA 45/135: 20%
- PERP 45/135: 19%
- AMO : 25%
Issues
- Pair Spec Magnet Power Supply Flush in morning (Tim) We need to get PSPEC working at 1200Amps.
- Issues with the TAGH HV module (Sasha) Need to check this board again.
- Start Counter (Beni) We want to confirm that the cables are in the right location.
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
Plans
- Citra flush PSPEC power supply. Go to beam permit today.
- Run production over weekend.
- High current test with RADCON on Monday
- RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday February 2
Past 24 hours
- Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
- Harp scans look OK [1]
- Production on diamond. ABU ~1.3 h for the day.
Shift Reports
Reports
- HVB current during HV scans (Naomi).
- CDC HVB current vs beam current using this morning's scan (Naomi).
- Current limits and rough estimates of safe HV (Naomi).
- Translation table updated for TAGM (Justin) .
- Swapped HV module for TAGH ch 145 to 168 (Boris).
- Attenuation in different materials (Lubomir).
- Transmission has dropped over the night (Alexandre).
- Trigger rates in 2020 and 2023 (Sasha).
- High Intensity Foil Absorbers (Scot).
- Remote reset for CAEN chassis (Tim and Bobby).
- GlueX Statistics
- PARA 0/90: 16%
- PERP 0/90: 19%
- PARA 45/135: 20%
- PERP 45/135: 18%
- AMO : 25%
Issues
- Start Counter (Beni) We want to confirm that the cables are in the right location.
- Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani) May be a an issue with timing offset calibrations.
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
Plans
- Wait for stable beam delivery for 4 halls. No timelime can be given.
- CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)