Wednesday July 7
Past 24 hours
- Malte and Mark worked on FCAL modules replacement [1]
- One of the RF crates had been disconnected, Beni fixed it [2]
- Bobby and others worked in the tagger hall during the day. At 3:30pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterwards, it was still locked on zero and there was still a Comm Status error [3]
- Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
- Had minor issues with DAQ at 7.00pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during day time [4]) Sergei worked out the DAQ issue at 7.50pm
- Established operating field of solenoid at 8:30pm.
- production data taking continued on Pb
Shift reports
- day shift summary
- swing shift summary
- [ owl shift summary]
- [ early riser shift summary]
Reports
- Sergey and Lubomir worked in the Hall this night around 10pm
- Hovanes reported his study of the coherent peak position drifts observed on 4th of July [5]
Issues
- Hovanes pointed out that something strange happened during solenoid ramping up [6]
Plans
- Continue production on lead
- Unmasking FCAL central modules from the trigger needs to be done unless if increases rate too high