March 24, 2022 CPP Design/Install Meeting
From GlueXWiki
Meeting Time and Place
Thursday March 24, 2022, 3:00pm
Zoom Meeting
https://jlab-org.zoomgov.com/j/1602846419?pwd=YTNEeXI3aHBKSERjMGpsTVJZd25sQT09&from=addon
Meeting ID: 160 284 6419 Passcode: 459361
- Invited - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I, Anthony, Alex S., Eugene
Agenda
- Installation Status
- Detector installed, paddles in work
- Cabling
- Microscope
- Hodoscope
- Target
- Vacuum
- Gas
- TAC requirements
- Hodoscope install requirements
- OSP
- Helium Bag inside CDC?
- Things to work out
- Release structural analysis - approved by Tom Renzo - need to release into system
- Installation drawing including Microscope move
- Helium bag inside CDC
Minutes
- Beni requested to re-start gas flow Monday
- Sasha suggested 3x3 crystal array for TAC - we should plan on putting one together for June run
- Discussed Hodoscope plate # 7 that is the only one not installed. It was determined that it is needed and we will install a little higher than nominal since there is interference with the microscope
- will meet Elton in tagger hall 8:30 am the 25th to have a look
- Determined that an OSP is not needed for CPP operation as it will be covered in the ESAD
- determined helium bag is needed inside CDC but not downstream of solenoid