CPP and NPP Run Conditions
From GlueXWiki
Activity | Duration (PAC Days) | Current | Target | Collimator | Radiator | Comment |
---|---|---|---|---|---|---|
Full target (Production) | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Empty Target | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Diamond Alignment | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Trigger Commissioning | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Beam Energy Calibration | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
TAC Runs | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 |
Header text | Header text | Header text |
---|---|---|
Example | Example | Example |
Example | Example | Example |