Run Planning Meeting Notes, October 7 - October 13, 2021
From GlueXWiki
Thursday, October 7
- In last 24 hours:
- Early Riser:
- Owl summary: https://logbooks.jlab.org/entry/3919305
- Swing summary: https://logbooks.jlab.org/entry/3919178
- Day summary: https://logbooks.jlab.org/entry/3918973
- Production run started at 20:58
- 0.21B with hot & cold Helium empty target cell
- Target cooled down and filled with liquid He4
- HallD cavity BPM calibration, https://logbooks.jlab.org/entry/3919129
- Gas bottle changed, https://logbooks.jlab.org/entry/3919183 (Elton)
- Issues:
- Target software, https://logbooks.jlab.org/entry/3919168 (Carlin)
- Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton)
- LED skim, https://logbooks.jlab.org/entry/3918989
- FCAL
- Bleedthrough Different Beam structure after target change
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 200 nA CDC & FDC turn off (5 shifts)
- 100 nA CDC & FDC turn off (2 shifts)