Preparation for 2021 Run
From GlueXWiki
Below are some action items which we would like to fix before the PrimEx Phase II run in Spring/Summer 2021.
- Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the
beam goes through the middle of the hole. The exact position should be confirmed by the the alignment group -- Tim Whitlatch