Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) #* Check status of monitoring control boards at JLab (Elton).
    2 KB (216 words) - 08:49, 25 April 2012
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) </strike> # Schedule, reporting, and manpower (Elton)
    3 KB (511 words) - 18:07, 26 April 2012
  • ...n the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom) </strike> # Schedule, reporting, and manpower (Elton)
    4 KB (718 words) - 09:02, 11 May 2012
  • * Elton Smith - ''eltonssmith''
    564 B (72 words) - 12:02, 18 July 2022
  • # <strike> Send drawings of light guide gauges to USM (Elton) </strike> sent e-mail yesterday #* [https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST Updates] (Elton)
    5 KB (849 words) - 23:59, 31 March 2015
  • * '''JLab''': Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann ...sue for this detector and to save real estate. That having been said, both Elton and Werner were in favor of including it if possible. One question is wheth
    3 KB (558 words) - 06:35, 1 April 2015
  • # Preliminary look at pulse heights and times (Elton) # Considerations in choosing the SiPM operating voltage (Notes by Elton)
    2 KB (261 words) - 10:30, 31 March 2015
  • # See Elton's new Wiki page for Spring 2016 run preparations ...(Athens), Will, Curtis (CMU), Noemi, Tegan, Ahmed, Zisis, Andrei (Regina), Elton, Mark (JLab) "
    4 KB (553 words) - 17:12, 24 February 2017
  • * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann ...filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting.
    3 KB (440 words) - 04:25, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (501 words) - 16:21, 24 May 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    525 B (67 words) - 11:33, 31 March 2015
  • * On simulating sampling fluctuations in the BCAL, David reported that Elton Smith has summarized the discussion held when Andrei and Irina Semonov(a) w
    5 KB (829 words) - 17:23, 31 March 2015
  • ## Gain of pre-amplifier. Elton suggested to set the nominal bias to Vover=1.2 V. With this configuration, ''Attending: Elton, Beni, Dvid, Tim (Jlab); Zisis (UofR); Will, Serguei, Javiera, Iñaki, Orla
    7 KB (1,092 words) - 23:59, 31 March 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=2147 Contract Status] --- Elton Smith ...ssion Ib (145) --- Electronics/Trigger - (Organizer: Sascha Somov) - Chair:Elton Smith
    8 KB (1,048 words) - 12:39, 14 March 2017
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (409 words) - 17:31, 21 June 2012
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)
    4 KB (667 words) - 16:01, 6 June 2012
  • ''Attendees: Fernando, Elton, Eugene, Beni (JLab), George, Andrei, Zisis (Regina)''
    2 KB (285 words) - 17:27, 18 June 2012
  • ''Attending: Elton, Beni, David, John, Ben, Yi, Tim (Jlab); Will, Javiera, Orlando, Iñaki (US ##* Elton: Checking signals on scope can be very informative.
    5 KB (754 words) - 15:57, 31 March 2015
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) ''Attendees: Elton, David, Beni, Tara, Tim, Eugene (JLab); Zisis, Andrei (UofR); Javiera, Will
    5 KB (734 words) - 14:26, 19 June 2012
  • * Elton Smith - ''eltonssmith''
    743 B (107 words) - 08:38, 19 June 2012

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)