Revision as of 12:45, 26 June 2019 by Irrigw (Talk | contribs) (Created page with " == Overview == During the second week of June 2019, 5 counters were removed from the TAGH. These counters all had scintillators that were loosely connected to their respectiv...")
Contents
Overview
During the second week of June 2019, 5 counters were removed from the TAGH. These counters all had scintillators that were loosely connected to their respective light-guides and were believed to not be functioning properly.