Friday, Nov 23 at 10:00
- Its Black Friday!
- Since Wednesday
- Start with luminosity scan (scratched transmission optimization).
- First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
- Continue with data production
- Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
- Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
- generally quite a rocky data taking period.
- general data quality looks reasonable.
- Run Plan
- continue production data taking nominal sequence with nominal beam current
- high luminosity test (red program) when Sasha is available (Friday or Saturday)
- any other requests for studies before beam goes away on Monday morning???