<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 2
Shift |
ABU |
BNA |
BANU
|
Day |
6.49 |
0.88 |
0.63
|
Swing |
6.97 |
0.71 |
0.32
|
Owl |
7.09 |
0.80 |
0.11
|
Total |
20.55 |
2.39 |
1.06
|
- Accelerator Status over the last 24 hrs
- Hall-D/GlueX items
- In the last 24 hours:
- Production data taken after 10:30 AM Weds.
- Long mode run
- Black spots on diamonds
- Total triggers collected during last period: 3099M
- Run Statistics Spread Sheet
- Current Total: 40.05B
- Issues
- Problems with FCAL crate 9
- FCAL red light issue
- TRD gas issue
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- Monitoring
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- AOB
Friday, March 3
Shift |
ABU |
BNA |
BANU
|
Day |
0.79 |
7.21 |
0.00
|
Swing |
4.75 |
2.50 |
0.75
|
Owl |
6.83 |
1.09 |
0.08
|
Total |
12.37 |
10.80 |
0.83
|
- Accelerator Status over the last 24 hrs
- Vacuum issues [~8 hours down]
- 1630 - Beam back
- 1730 - Attempt at trigger & DAQ studies
- 1800 to 1840 - ACC access to replace controller
- 1900 to 1930 - FSD Card swap
- 2000 - Start of production
- 500 - 20 min down due to cryomodule problems
- Strip charts: 1 2
- Hall-D/GlueX items
- Issues
- Red lines on run control GUI?
- Front-panel triggers off for 30920-2
- Firefox problems
- Monitoring
- Run Plan
- Tagger/SC trigger
- Hall A Bleed-through?
- Empty target run?
- fADC250 Compressed Mode?
- Production
- Next week:
- High rate run [500 nA]
- Low rate run [50 nA + 2x10^-5 RL Al]
- Offline Analysis
- AOB
Saturday, March 4
Shift |
ABU |
BNA |
BANU
|
Day |
6.79 |
1.18 |
0.03
|
Swing |
6.17 |
0.71 |
1.12
|
Owl |
7.29 |
0.64 |
0.07
|
Total |
20.25 |
2.53 |
1.22
|
- Accelerator Status over the last 24 hrs
- Steady beam delivery
- New slow lock status display logbook entry
- Strip charts: 1 2 3
- Hall-D/GlueX items
- Tagger/SC trigger studies
- Hall A Bleed-through study: 1 2
- Empty target run accomplished
- fADC250 Compressed Mode Study
- Better downtime tracking in elog
- In the last 24 hours:
- Total triggers collected during last period: 1771M
- Run Statistics Spread Sheet
- Current Total: 42.8B
- Issues
- ~2hrs lost to DAQ problems on Fri. morning
- Monitoring
- Run Plan
- Production + Afternoon harp scan
- Next week:
- High rate run [500 nA]
- Low rate run [50 nA + 2x10^-5 RL Al]
- Offline Analysis
- AOB
Sunday, March 5
Shift |
ABU |
BNA |
BANU
|
Day |
6.94 |
0.74 |
0.32
|
Swing |
7.31 |
0.52 |
0.17
|
Owl |
6.78 |
1.19 |
0.03
|
Total |
21.03 |
2.45 |
0.52
|
- Accelerator Status over the last 24 hrs
- Hall-D/GlueX items
- Harp scan including beam dump radiator: 1, 2
- FCAL hole - Bad board in ROCFCAL12, slot 18
- Low photon flux data taken during owl shift, ~14M triggers
- In the last 24 hours:
- Total triggers collected during last period: 2338M
- Run Statistics Spread Sheet
- Current Total: 45.1B
- Issues
- Bad FCAL fADC250, low on spares
- Known DAQ problems with EB/cMsg
- Monitoring
- Run Plan
- Production Data
- Tentative Accelerator Schedule:
- Monday: Establish beam to Hall C - 9 AM to 1 PM
- Tuesday: Beam studies - 9 AM to 2+ PM
- Offline Analysis
- AOB
Monday, March 6
Shift |
ABU |
BNA |
BANU
|
Day |
5.91 |
0.90 |
1.19
|
Swing |
7.25 |
0.66 |
0.09
|
Owl |
7.00 |
0.87 |
0.13
|
Total |
20.16 |
2.43 |
1.41
|
- Accelerator Status over the last 24 hrs
- Steady beam delivery, resteer due to BLMs 1-2 per shift
- AC slow locks: 1, 2
- Strip charts: 1 2
- Hall-D/GlueX items
- Busy Friday: min-bias trigger studies, Hall A Bleed-through study, fADC250 compressed mode, empty target run
- Saturday: Harp scan including beam dump radiator: 1, 2
- Sunday: Low photon flux data taken during owl shift, ~14M triggers
- In the last 24 hours:
- Total triggers collected during last period: 2722M
- Run Statistics Spread Sheet
- Current Total: 47.8B
- Issues
- Monitoring
- Run Plan
- More Production Data
- High rate run [500 nA]?
- Low rate run [50 nA + 2x10^-5 RL Al]?
- New diamond alignment?
- Anything else?
- Tentative Accelerator Schedule:
- Monday: Establish beam to Hall C - 9 AM to 1 PM
- Tuesday: Beam studies - 9 AM to 2+ PM
- Offline Analysis
- AOB
Tuesday, March 7
Shift |
ABU |
BNA |
BANU
|
Day |
1.16 |
6.80 |
0.01
|
Swing |
0.62 |
7.00 |
0.38
|
Owl |
2.58 |
5.42 |
0.00
|
Total |
4.36 |
19.22 |
0.39
|
- Accelerator Status over the last 24 hrs
- Beam down until 8:15 PM, injector problems during day, problems delivering beam until ~5 AM
- Strip charts: 1 2
- Hall-D/GlueX items
- In the last 24 hours:
- Total triggers collected during last period: 2.4M
- Run Statistics Spread Sheet
- Current Total: 50.2B
- Issues
- Monitoring
- Run Plan
- Beam studies: 9 AM - 5 PM
- Hall D optics studies: 9 AM - 11 AM
- Controlled access at 11 AM
- Spring 2017 High Intensity Run Plan
- Full circuit with fADC250 compressed mode (4 diamond orientations and AMO)
- Harp scans with and without tagger quad
- L3 Tests?
- New diamond alignment?
- TAC run?
- Run progress
- Offline Analysis
- AOB
Wednesday, March 8
- Accelerator Status over the last 24 hrs
- Beam down until ~9:00 PM, injector problems during day, problems delivering beam until ~5 AM
- Strip charts: [1] [2]
- Hall-D/GlueX items
- Controlled Access
- FADC250 firmware check 1, 2
- Low rate run study
- In the last 24 hours:
- Total triggers collected during last period: XM
- Run Statistics Spread Sheet
- Current Total: XB
- Issues
- Monitoring
- Run Plan
- Offline Analysis
- New Run Coordinator: Richard Jones