Thursday, February 23
Shift |
ABU |
BNA |
BANU
|
Day |
5.11 |
1.07 |
1.82
|
Swing |
6.46 |
0.77 |
0.76
|
Owl |
2.35 |
0.00 |
5.65
|
Total |
13.92 |
1.85 |
8.23
|
- Accelerator Status over the last 24 hrs
- Beam was mostly
- Harp scans:
- Beam was re-focused around noon ELOG
- final MCC scans : IHA5C11, IHA5C11B
- Radiator HARP scans: Radiator Harp
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
- new Harp scans as part of beam steering problem: MCC, Radiator Harp
- Hall-D/GlueX items
- Downtime incidents of more than 30 minutes:
- DAQ 10:45 for about 40 min. , Sergey helped
- Beam position lock on active collimator steered the beam away: 00:15
- Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
- Total triggers collected: 1400 M
- Issues
- Active collimator
- DAQ issues:
- difficult restart at 10:45pm
- Monitoring
- Run Plan
- Repair active collimator.
- HIgh luminosity ?
- Offline Analysis?
- Any Other Business?
Friday, February 24
Shift |
ABU |
BNA |
BANU
|
Day |
3.12 |
1.31 |
3.57
|
Swing |
6.13 |
0.72 |
1.15
|
Owl |
5.76 |
1.96 |
0.28
|
Total |
15.01 |
4.00 |
5.00
|
- Accelerator Status over the last 24 hrs
- Beam was mostly:
- Harp scans:
- Hall-D/GlueX items
- In the last 24 hours:
- Feb 23: Total triggers collected: 1580 M
- Current Total: 27.1 B
- Trigger studies (Sasha)
- TRD test (Lubomir)
- Tested new tagger microscope settings for high luminosity (Alex)
- Issues
- Active Collimator repair
- Rebooting IOC did not help
- Alex Barnes and Trent Allison found problem to be low voltage power supply, repair completed 11:55am ELOG.
- DAQ issues:
- Crash, Sergey helped recovering (approx. 45 min)
- Monitoring
- Run Plan
- Current Plan
- Long mode run ?
- Empty target run ?
- TAC run ?
- High luminosity ?
- Offline Analysis
- Any Other Business
Saturday, February 25
Shift |
ABU |
BNA |
BANU
|
Day |
4.27 |
2.49 |
1.24
|
Swing |
2.63 |
4.93 |
0.44
|
Owl |
5.20 |
0.78 |
2.03
|
Total |
12.09 |
8.20 |
3.72
|
- Accelerator Status over the last 24 hrs
- Beam was:
- somewhat "trippy" in the afternoon: [[1]]
- mostly stable during the night
- Down times
- Harp scans:
- Hall-D/GlueX items
- switched to 150nA
- adjusted detectors
- DAQ data rate 50kHz
- created new reference plots for radiator GUI
- In the last 24 hours:
- Feb 25: Total triggers collected: 2,001 M
- Run Statistics Spread Sheet
- Current Total: 29.2 B
- Issues
- Monitoring
- reference plots need to be updated for 150nA running
- Run Plan
- Take production data at 150nA
- Offline Analysis
- Any Other Business
Sunday, February 26
- Accelerator Status over the last 24 hrs
- Beam was mostly:
- Down times
- Harp scans: None
- Hall-D/GlueX items
- some FCAL HV settings needed to be adjusted [[2]]
- In the last 24 hours:
- Feb 26: Total triggers collected: M
- Run Statistics Spread Sheet
- Current Total: B
- Issues
- Monitoring
- reference plots need to be updated for 150nA running
- Run Plan
- Take production data at 150nA
- perform Harp scans
- Offline Analysis