May 2, 2013 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 18:02, 25 April 2013 by Elton (Talk | contribs) (→Action Items from previous meetings)
Action Items from previous meetings
- Interface with Tom for optimum placement of tubing in cooling plate during gluing. Provide a cover plate to assist with alignment. (Chris and Nic)
- Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)\
- Check on status of returning "borrowed" SiPM (Elton)
Tentative Agenda
- Announcements
- Action Items
- Light guides (Tina)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)
Minutes
Attending: