Minutes-4-25-2013
From GlueXWiki
April 25, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Third package status
- Spare package
- Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
- Installation (Lubomir, Bill)
- FDC installation document
- Practicing at Blue Crab
- Engineering (Bill)
- Electronics (Chris, Nick)
- Full electronics tests FDC E-log (Beni)
- Other