Minutes-2-7-2013
From GlueXWiki
February 7, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #2 testing (Lubomir)
- Basis of Estimate for the FDC activities cabling manhours (Lubomir, Bill, Dave)
- Corrosion tests at MePhi latest results (Lubomir)
- Engineering [1], [2], [3], [4], [5]-2021.pdf, [6] (Bill)
- Electronics (Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other