Minutes-1-17-2013
From GlueXWiki
January 17, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Production status (Dave)
- Second package tests (Lubomir)
- Basis of Estimate for the FDC activities ,guideline (Lubomir, Bill, Dave)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Fourth package tests FDC E-log Entry 101
- Other