Private:UConn test setup
From GlueXWiki
Boards in the crate
Board | Slot | Serial |
---|---|---|
CPU (halldtrg5) | 1 | |
TI (Old) | 2 | |
FADC250 | 5 | B21595_06R |
SDC | 9 | |
LE discriminator | 14 | C_15 |
F1TDC | 16 |
Front pannel connections
From | To |
---|---|
External trigger | TI input, IN1 |
L1 Accept ( 3rd from the bottom ) | SDC TRG |
L1 Accept ( 4 th from the bottom ) | F1TDC TRG |
TI Out0 | F1TDC SYNC |
Setting up the setup
- Connect keybord and monitor (if needed) to the Intel ROC.
- Connect Ethernet cable to the upper ROC LAN connector.
- Change ROC IP address (you will see the MAC address when you start booting the controller)
- Login under halld
Directories
- The home directory is /home/halld
- /home/halld/micro/rol contains the F1TDC configuration file and the link to the DAC readout list (see descriptions below)
- /home/halld/micro/coda contains Run Control data base
- /home/halld/data is a directory for the DAQ data storage. The external drive has to be mounted to here
- /home/halld/micro/coda_micro_setup is a script with configuration variables
- you have to edit this file ad change some variables if needed
- source coda_micro_setup to set variables up
How to run DAQ
Change electronics boards initialization parameters