Minutes-8-11-2011
From GlueXWiki
August 4, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- Wire deadening
- Other: Humi-seal, silver epoxy overheating
- Engineering (Bill)
- Update
- Package flatness
- Electronics (Chris)
- Update
- Pre-amp card connectors
- Chamber testing at EEL126
- Cell#2 status
- Other