April 15, 2022 Tech group SAD meeting
From GlueXWiki
Meeting Time and Place =
Friday April 15 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - ?
- Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move/Hodoscope plate #7 - surveyed 4 mm high - poly shielding?
- Moveable Lead absorber - Write procedure
- Target - Bobby - need drawings
- Gas - Scot
- Helium bag Media:Hebag.jpg
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- matching mu metal to steel shields
- cutting tool
- Tagger NMR repair - Scot
- Tagger controls UPS
- BCAL Coldshot Chiller commissioning - Josh
- Target/Goni Turbo repair - Keith
- TEDF move in May to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation - Anthony gave presentation - file and instructions on O drive
- FCAL Insert Drawings
- New Profiler install
- New 3x3 CCAL for TAC Media:CPP_TAC.pdf
- Tagger Radiator Mod Media:Fork_mod.pdf
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Scot
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Set up next PS parasitic meeting
- Decide on Goni maintenance
- Delineate ePAS permit requests for Isolation Certificate