Run Planning Meeting Notes, Feb 06-Feb 12, 2020
From GlueXWiki
Friday, February 7
- Last 24 hours
- Production runs @350nA until 14:00
- Hovanes worked on diamond position for JD70-105 0/90 (see reports)
- Continued data taking until 18:15
- Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
- Accelerator crew was having network issues too
- Hall went into beam permit around 1:15am
- Accelerator crew having trouble with control system (see issues)
- Issues
- Reports
- Plans for today
- Production runs
Thursday, February 6
- Last 24 hours
- Beam was sent to hall at 19:51
- Harp scans (see reports for details)
- Production runs @ 350nA
- Collected 1.8B events
- Issues
- DIRC temperature alarm (resolved, see: [11])
- Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
- Reports
- Harp scan results: acc: 5C11,acc: 5C11B, Hall D: TAGH
- Test of DIRC communication algorithm (see: [12])
- Missing optical links in DIRC (see: [13])
- Plans for today
- Production runs