Run Planning Meeting Notes, April 19-April 25, 2016
From GlueXWiki
Wednesday, April 20
- Accelerator Status
- Overnight running???
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Hall-D/GlueX items
- Running overnight
- ABUs
- Triggers
- Run Statistics
- Hall D access Wednesday 20 April.
- RadCon has been contacted.
- Access possible in the morning
- Beam studies in the afternoon (upstream slow locks)
- Walkthrough (Hall and Tagger)
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Microscope gain balancing
- Report on Trigger studies
- Report on TRD studies
- Latest Occupancy Plots look reasonable??
- Running overnight
- Run Plan
- Mode 8 (raw mode) running with cosmics during access
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- Offline Analysis?
- Any Other Business?
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
- No tagger access required???
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Latest Occupancy Plots look reasonable
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?