Testing Page for Experiment Procedures for the Base Equipment in Hall
From GlueXWiki
Revision as of 11:31, 21 May 2014 by
Elton
(
Talk
|
contribs
)
(
diff
)
← Older revision
|
Latest revision
(
diff
) |
Newer revision →
(
diff
)
Jump to:
navigation
,
search
Information for Shift Takers
Detector operation
Approved procedures
Standard documentation
Introduction
Beam Line Detectors
Tagging Spectrometer
Pair Spectrometer
Solenoid
Cryogenic Target
Solid Target
Electronics
Slow Controls
Data Acquisition
Online Monitoring
Gas System
Forward Drift Chamber
Central Drift Chamber
Barrel Calorimeter
Forward Calorimeter
Time-of-Flight System
Start Counter
Gas System Operation (Scot Spiegel/ Dave Butler)
Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
Insertion/removal CDC (Tim Whitlatch)
Vacuum / damage to radiators/convertes (Tom Carstens)
Thin windows / Alcove and near photon beam dump (Tom Carstens)
Magnet power supplies. Accelerator OSP?
Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
Solenoid, several procedures. Need to get a list of proceedures
Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
Cryogenic target. Chris Keith will lead the OSP effort
Training for Work in the FCAL Dark Room (D00000-01-06-P006)
Conduct of Operations (COO)
Experimental Safety Assessment Document (ESAD)
Radiation Safety Assessment Document (RSAD)
Emergency Response Guidelines (ERG)
Summary of Hall D Subsytems (D00000-00-00-S006)
Hall-D List
Hall D Electronic Log Books
Navigation menu
Views
Page
Discussion
View source
History
Personal tools
Log in
Navigation
Main page
Recent changes
Random page
Help
Search
Tools
What links here
Related changes
Special pages
Permanent link
Page information
Cite this page