OWG Meeting 8-May-2013
Agenda
Note one-time room change to A110
- Announcements
- Review of minutes from 10-Apr-2013 meeting
- Online build system and file structure - Elliott
- Translation table - Dave L
- Status of DAQ testing in Rack Room - Dave A, Bryan
- Counting House update - Hovanes, Elliott
- Solenoid test update - Elliott
- EPICS update - Hovanes
- Controls update - Elliott, Hovanes
- JInventory database - Elliott
- DAQ group projects- Bryan, Dave A, Graham, Carl, Vardan, Elliott
- EVIO, cMsg, CODA3, ECS/CSS, disentangler, readout list, Java/cMsg GUI
- Electronics, trigger and DAQ status reports - Chris, Alex, Dave, Fernando, Ben, Ed, William, Bryan
- Mantis Task Tracker
- Midas Elog
- Upcoming topics
- Calibration/Alignment issues?
- Status of processing uncompressed and compressed simulated raw data and monitoring/L3 farm - Dave L, Elliott
- What online projects can other groups take over? - Elliott
- Status and schedule of Hall D projects proposed to be done by DAQ group - Graham
- Linux SBC configuration, installation, booting - by Bryan
- InfiniBand hardware specification, purchase, installation - by Dave A
- Farm manager CODA component - by Vardan
- Ed to talk more on FPGA programming
Time/Location
1:30 PM Wed 8-May-2013 CC A110
Announcements
Next Meeting
1:30 PM Wed 22-May-2013 CC F326
Minutes
Present: Elliott W, Mark I, Simon T, Bryan M, Dave A, Vardan G, Beni Z, Alex S.
Online Build System
Elliott presented plans for the online build system and directory structures, see link above for details. SCONS will be used instead of Make (used in the offline) for a number of reasons. The design is loosely based on a hybrid of what is done by the Hall D offline build system, the DAQ group and CLAS12. The basic strategy for using SCONS comes from Maurizio Ungaro (CLAS12). The online will use the same svn repository as the offline.
Translation Tables
Dave L presented plans and progress on implementing a translation table in JANA, see the link above for details.