January 16, 2013 Tracking CDC/FDC
From GlueXWiki
Meeting Time and Place
Wednesday January 16, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcements
- Collaboration Meeting
- FDC Update
- CDC Update
Minutes
Present: Curtis, Naomi, Beni, Simon, Lubomir, Eugene, Mark
- Collaboration meeting
- 3 talks have been reserved for tracking
- FDC Update
- CDC Update
- CDC construction has been stalled pending the arrival of the transfer ring (STOP PRESS the shipment of this was authorized this afternoon - wahoo!)
- Naomi measured pedestal widths of the HVB & preamp combinations inside a grounded metal box and found that the pedestal width of the original HVB and preamp4 was only 2 fADC units, after altering the HVB to attenuate the input charge to the preamp and later removing the preamp's terminating resistors to match its range to that of the fADC we now have a pedestal width of 15 fADC units, before adding any pickup from the chamber (pickup from the prototype now adds only 1-2 fADC units). The increased pedestal width was not so obvious at the time because the noise from the prototype was dominated by pickup from the thermocouples (since removed).
- Eugene requires an estimate of CDC completion date and costs to completion. CMU's contract needs to be extended to allow the CDC to be tested at CMU until Hall D is ready to receive it (probably in August). Testing was included in the original contract but the original delivery point is April.