Beam Test Meeting Mon. Mar. 12, 2012
From GlueXWiki
Agenda
- BCAL preparations
- Assembly Photos
- Electronics Update (Fernando)
Minutes
FCAL
- the slot 9 adc was not properly seated in the 3.3 Gev runs, it is seated now
BCAL
- gluing of the light guides is done, they are slightly over sized
- plan is to set up in 126 within a week and install in the hall on March 21
Hall A Calorimeter
- plan is to put in hall by Mar 14 and slide under tagger on March 21
General info
- Sergey, Alex, and John will characterize the energy of the 3 remote paddles under the tagger on the floor
- Hall will be at 5 pass for remainder of run except for a week with a global energy change at some future date