September 15, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • First package tests (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update
  4. Chamber testing at EEL126 (Beni)
  5. Other


Minutes

Participants: Eugene, Bill, Dave, Mark, Simon, Beni, Glenn, and Lubomir.

Production

- Started stacking again the package; we have already installed the first cell and the first cathode for cell#2. The second cathode of cell#2 and the second wire plane are also ready for installation after replacing two wires (see explanations below). Cell#3: the wire plane is ready except that four broken resistors need to be replaced. The two cathodes for cell#3 were checked with a generator and a problem in one connector was found: attenuation of the signal on several channels; the conductive tape on that connector will be re-heated. On all the frames in this stack (except the bottom end window and wire frame) we put new O-rings, because we observed some gas leakage. All the cathodes for the first package are ready except one; it has been tensioned and the next operation is to cut the flaps.