OWG Meeting 25-May-2011
From GlueXWiki
Agenda
- Announcements
- Review of minutes from 27-Apr-2011 meeting
- Coil test update - Elliott, Yi, Beni, Ivan
- short to ground, ground fault detector
- strain gauges
- VME fast DAQ system
- SiPM tests
- VME/VXS and HV/LV crate tests
- IT review - Mark, Dave
- Remote Access review - Graham
- IRMIS - Elliott
- Event size and raw event format - Dave, Carl
- Event display - Elliott, Andrew
- Java coda object framework - Elliott, Andrew
- Other hardware tests - Chris, Beni
- Multi-crate trigger test
- FDC cosmic ray test
- DAQ Group code distribution, build system, include dirs - Carl
- Controls test stand - Hovanes, Elliott
- Update on conditions database - Mark
- Electronics, trigger and DAQ status reports - Chris, Alex, Dave, Fernando, Ben, Ed, William, Bryan
- Mantis Task Tracker
Time/Location
1:30 PM Wed 25-May-2011 CC F326
Announcements
Next Meeting
1:30 PM Wed 8-Jun-2011 CC F326
Minutes
Present: Elliott W, Simon T, Bryan M, Graham H, Dave L, Hovanes E, Beni Z, Dave A.
Coil Test
Elliott reported on the status of the recent coil test.
- Ramped to 1500 A the previous Mon.
- No problems with cryo, magnet, power supply, control system.
- Short to ground requried addendum to OSP, caused a few days delay. Can run with max one short to ground.
- A few problems with safety system.
- some strain gauges broken or improperly wired.
- needed another OSP revision to allow operation with no strain gauges on radial Heim columns.
- used field asymmetry measurments to indirectly determine stresses on radial Heim columns.
- Coil 2 put back together, found one leak that will be repaired.