CDC Construction

From GlueXWiki
Revision as of 15:48, 5 January 2011 by Cmeyer (Talk | contribs) (→‎Construction)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Contents

  • 1 The GlueX CDC
    • 1.1 Overview
    • 1.2 Construction
      • 1.2.1 Fabrication Documentation
      • 1.2.2 Production Documents
      • 1.2.3 Photographs
    • 1.3 Prototype Studies

The GlueX CDC

Overview

Construction

  • CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
  • Details of the CDC Construction
  • Submitted Monthly Reports
  • The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.

Fabrication Documentation

  • Assembly documents
    • Final CDC Drawings
    • End plate Alignment
    • Straw Assembly and Insertion
    • Wire String Details
    • Summary of Tests
    • Document describing the measurement of wire tensions.
  • Q&A Documents
    • Straw-tube acceptance checks
    • Aluminum Donut acceptance checks
    • Aluminum Feedthru acceptance checks

Production Documents

  • Conducting Epoxy Order Schedule
  • Final Drawings

Photographs

  • Photographs of the CDC Construction

Prototype Studies

Retrieved from "https://halldweb.jlab.org/wiki/index.php?title=CDC_Construction&oldid=24287"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Main page
  • Recent changes
  • Random page
  • Help

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
  • Cite this page
Powered by MediaWiki
  • Privacy policy
  • About GlueXWiki
  • Disclaimers