Run preparation check list
From GlueXWiki
- TAGH / TAGM
- Move tagger microscope (Tim, eng)
- Install plate with TAGH counters (Tim, eng)
- Connect cables (Richard/Nick/Chris)
- Install fixed TAGH counters (Chris, Sasha)
- Allign TAGH/TAGM (survey group)
- Check TAGM / TAGM scalers (Richard/Sasha)
- CCAL installation
- Install CCAL movable platform (Tim, eng)
- Install CCAL on the platform (Tim, eng)]
- Connect cables (Sasha, Vlad, Arshak, Chris)
- Restore slow control (Nick)
- Connect cables and check the LMS (Arshak/Sasha)