Run Planning Meeting Notes, November 11 - November 17, 2021
From GlueXWiki
Friday November 12
- Last 24h:
- Issues:
- bad f250 in TAGH [6] - no longer an issue (Sasha power-cycled the crate)
- transmission - Hovanes will do AC scan when the beam is back after 10am - profiler doesn't lock has to be fixed at that time, as well
- Plan:
- Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) - FCAL items will be surveyed
- Continue production at 150nA on diamond
- Analysis update