Difference between revisions of "Apr 2, 2020 Calorimeter"
From GlueXWiki
Line 47: | Line 47: | ||
## BCAL | ## BCAL | ||
# Calibrations | # Calibrations | ||
− | ## PrimEx gain calibration [ | + | ## PrimEx gain calibration [https://halldweb.jlab.org/wiki/images/b/bd/PrimExGainCalib.pdf]] |
− | ## Spring 2020 GlueX gain calibration [[ | + | ## Spring 2020 GlueX gain calibration [[https://halldweb.jlab.org/wiki/images/1/15/Pi0gainmatrixspring2020.pdf]] |
# Monitoring | # Monitoring | ||
# Reconstruction | # Reconstruction |
Revision as of 10:38, 2 April 2020
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Contents
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
References
- FCAL HDFCAL log book
- BCAL HDBCAL log book
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
- Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Check switches on FCAL board with high scaler rates and make sure it is set to 2 V full scale. (Colin and Sasha)
- Move monitoring plots of the FCAL/BCAL front panel triggers into FCAL/BCAL monitoring section (Zisis)
- Complete calibrations by April 1? See 2020 Data Production
Tentative Agenda
- Announcements
- Announcement at Production and Analysis meeting.
- Complete calibrations by April 1? See 2020 Data Production
- Monitoring Plan
- Action Items
- Run Updates
- FCAL
- BCAL
- Calibrations
- Monitoring
- Reconstruction
- Efficiencies
- Simulations
- NIM articles
- Any other business
Minutes
Attending: