Difference between revisions of "Run Planning Meeting Notes, Mar 19-Mar 25, 2020"
From GlueXWiki
(→Saturday, March 21) |
|||
Line 48: | Line 48: | ||
#* Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.) | #* Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.) | ||
#* Production | #* Production | ||
+ | |||
+ | == Sunday, March 21 == | ||
+ | # Last 24 hours | ||
+ | #* Monitoring: | ||
+ | # Reports/Issues | ||
+ | # Run Plan | ||
+ | # Shutdown Plan |
Revision as of 11:52, 21 March 2020
- Single-person shift schedule in operation, since Tuesday 16:00
- the schedule, linked from main Hall-D web page -- Eugene
- the shift rules, linked from main Hall-D web page -- Eugene
- the shift rules, linked from hdops wiki -- Eugene
- 4-hall video feeds are now available, displayed on screen above copier
- Continuous bluejeans meeting open in counting house -- Needs another connection in order to remain open.
Thursday, March 19
- Last 24 hours
- TAC run -- MCC report
- Reports/Issues
- Transmission is back to higher level -- Alexandre
- BCAL LED triggers missing -- Elton
- Run Plan
- Production
Friday, March 20
- Last 24 hours
- Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
- Monitoring Okay [1], [2]
- CDC 2 channel trip on over-current -- Elton
- Later ramp up fine. -- Elton
- BCAL Hot channel fixed by Sergey
- Reports/Issues
- Run Plan
- Production
Saturday, March 21
- Last 24 hours
- Completed a full cycle of radiator settings
- Monitoring:
- Various issues CDC and FDC holes, -- Olga
- RF & TPOL - quite different to reference plots. -- Ken
- Reports/Issues
- DAQ problems -- Amy
- 8% PS rate decrease over 2-3 hours -- Elton
- FDC HV trip --
- Empty target results -- Simon
- fadc250 "bad pulse data" bug in earlier 2020 spring data diagnosed, solved -- Richard
- Run Plan
- Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.)
- Production
Sunday, March 21
- Last 24 hours
- Monitoring:
- Reports/Issues
- Run Plan
- Shutdown Plan