Difference between revisions of "Run Planning Meeting Notes, Mar 19-Mar 25, 2020"
From GlueXWiki
(→Friday, March 20) |
(→Friday, March 20) |
||
Line 19: | Line 19: | ||
== Friday, March 20 == | == Friday, March 20 == | ||
# Last 24 hours | # Last 24 hours | ||
+ | #* Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA | ||
#* [https://logbooks.jlab.org/entry/3806367 CDC 2 channel trip on over-current] -- Elton | #* [https://logbooks.jlab.org/entry/3806367 CDC 2 channel trip on over-current] -- Elton | ||
#** [https://logbooks.jlab.org/entry/3806398 Later ramp up fine.] -- Elton | #** [https://logbooks.jlab.org/entry/3806398 Later ramp up fine.] -- Elton |
Revision as of 08:33, 20 March 2020
- Single-person shift schedule in operation, since Tuesday 16:00
- the schedule, linked from main Hall-D web page -- Eugene
- the shift rules, linked from main Hall-D web page -- Eugene
- the shift rules, linked from hdops wiki -- Eugene
- 4-hall video feeds are now available, displayed on screen above copier
- Continuous bluejeans meeting open in counting house -- Needs another connection in order to remain open.
Thursday, March 19
- Last 24 hours
- TAC run -- MCC report
- Reports/Issues
- Transmission is back to higher level -- Alexandre
- BCAL LED triggers missing -- Elton
- Run Plan
- Production
Friday, March 20
- Last 24 hours
- Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
- CDC 2 channel trip on over-current -- Elton
- Later ramp up fine. -- Elton
- BCAL Hot channel fixed by Sergey
- Reports/Issues
- Run Plan
- Production