Difference between revisions of "Run Planning Meeting Notes, Feb 20-Feb 26, 2020"
From GlueXWiki
(→Monday, February 24) |
(→Monday, February 24) |
||
Line 32: | Line 32: | ||
#** 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [https://logbooks.jlab.org/entry/3789843] | #** 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [https://logbooks.jlab.org/entry/3789843] | ||
#** New BCAL pedestals | #** New BCAL pedestals | ||
− | #** MCC increased ion chamber trip level by 3-5% | + | #** MCC increased ion chamber trip level by 3-5%. Seems to have been successful in reducing trips |
# Reports/Issues | # Reports/Issues | ||
#* [https://logbooks.jlab.org/entry/3788922 BCAL gains changed in a number of modules]- Mark | #* [https://logbooks.jlab.org/entry/3788922 BCAL gains changed in a number of modules]- Mark | ||
Line 38: | Line 38: | ||
#* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex | #* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex | ||
#* [https://logbooks.jlab.org/entry/3790042], [https://logbooks.jlab.org/entry/3790633] Timing calibrations not updating, should be fixed in a day or so | #* [https://logbooks.jlab.org/entry/3790042], [https://logbooks.jlab.org/entry/3790633] Timing calibrations not updating, should be fixed in a day or so | ||
+ | # Run Plan | ||
+ | #* Production Running | ||
+ | #* Maybe access tomorrow? Hopefully will know by end of day | ||
+ | #* No beam 9am-12pm Wednesday due to safety meeting | ||
+ | #**We can not access the hall during this time |
Revision as of 09:29, 24 February 2020
Thursday, February 20
- Last 24 hours
- Smooth production running (18hrs/24hrs with beam)
- Reports
- Run Plan
- Production running
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
Friday, February 21
- Last 24 hours
- Production running for us
- ESR issue which caused ~12 hour downtime for halls A-C
- MCC adjusted AD00 due to BLM trips without informing us
- Production running for us
- Reports
- [1], [2], [3] BCAL gains and temperature have changed after the incident - Mark
- Convergence looks fine
- PS enhancement after beam spot move-Justin
- Rates- Alexandre
- DIRC Tile Temperature alarm
- Run Plan
- Production running over the weekend
- List for opportunistic access? Nothing scheduled now.
- Tuesday there will be 3 hour access due to laser work
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
- Production running over the weekend
Monday, February 24
- Last 48 hours
- Production running
- 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [4]
- New BCAL pedestals
- MCC increased ion chamber trip level by 3-5%. Seems to have been successful in reducing trips
- Production running
- Reports/Issues
- BCAL gains changed in a number of modules- Mark
- Convergence look normal
- Missing RCDB variables-Alex
- [5], [6] Timing calibrations not updating, should be fixed in a day or so
- Run Plan
- Production Running
- Maybe access tomorrow? Hopefully will know by end of day
- No beam 9am-12pm Wednesday due to safety meeting
- We can not access the hall during this time