= Agenda = | = Agenda = | ||
− | # | + | # Discussion |
− | #* Geometry | + | #* Geometry and drawings - sign off procedures |
− | #* | + | #* Evaluation of bid responses to fiber RFPs. |
− | #* | + | #* Discussion on agenda Items for collaboration meeting |
− | #* | + | # Reports |
− | #* | + | #* Geometry for simulations in repository (Beni) |
− | #* | + | #* Updates on simulation of performance (Blake) |
− | #* | + | #* Preparations for construction (George and Jim) |
+ | #* Measurements of fiber light output (Andrei) | ||
+ | #** Preparations for fiber testing at JLab (Beni) | ||
# Review of To-do List | # Review of To-do List | ||
# Updates | # Updates | ||
Line 38: | Line 40: | ||
#* FCAL | #* FCAL | ||
#* BCAL | #* BCAL | ||
− | |||
− | |||
# Any other business | # Any other business | ||
=Minutes= | =Minutes= | ||
Attending: | Attending: |
Revision as of 10:13, 14 August 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: July 21, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
To-do List from previous meeting
- Identify files with new geometry (Beni)
- Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
- Resolution studies with up-to-date geometry (Blake)
- Resolution studies with different segmentation for the outer section.
- Add F100 rad hard glass to simulation.
- Calibration meeting Tues Aug 26
- Decision on Bcal sampling fraction needed by Sep.
Agenda
- Discussion
- Geometry and drawings - sign off procedures
- Evaluation of bid responses to fiber RFPs.
- Discussion on agenda Items for collaboration meeting
- Reports
- Geometry for simulations in repository (Beni)
- Updates on simulation of performance (Blake)
- Preparations for construction (George and Jim)
- Measurements of fiber light output (Andrei)
- Preparations for fiber testing at JLab (Beni)
- Review of To-do List
- Updates
- Calibration system
- FCAL
- BCAL
- Any other business
Minutes
Attending: