− | Attendees: Josh, Liping, Sascha, Simon | + | Attendees: Josh, Liping, Sascha, Simon, Zisis |
* Josh has assembled one full prototype module, plan is to build ~10 more | * Josh has assembled one full prototype module, plan is to build ~10 more | ||
** No issues so far with brazing or tension | ** No issues so far with brazing or tension |
Revision as of 14:19, 16 September 2019
Meeting time and location= 1:00 pm EST (JLab time) F228
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
FCAL-II update: status and plans
Minutes
Attendees: Josh, Liping, Sascha, Simon, Zisis
- Josh has assembled one full prototype module, plan is to build ~10 more
- No issues so far with brazing or tension
- Waiting for soft-iron shields: 1020 steel, Tim will anneal
- Waiting for light guide material to test with silicone cookies
- Tim found 18 mm diameter acryllic rods
- Plan to attach light guides to tubes with RTV
- Design for box/frame for beam tests (12 modues at a time) ~ready
- Will be able to accommodate different light guides
- Need to order HV/signal cables for beam tests (Fernando)
- Vlad Popov has been working on fine-tuning active base design
- Stabilization of last dynode: use FET?
- Add low-pass filter?
- Would like 2-3 different versions to check before November run
- We discussed space considerations: need a relatively clean area but not a full "clean room"
- Space in TEDF has been identified, would like lock -- fenced off area?
- 3 heavy duty shelves
- Manpower: getting someone from Russia to help out even through U. Regina will be tricky
- JLab detector support group can help out
- Yerphi researcher (Arshak?) is interested in participating, will come for 3 months, possibly up to 6 months
- Anatoly (who worked on Primex crystal assembly) is retired but wants to participate -- affiliate with UNCW?
- CMU can do some fabrication, has machine shop
- Need to identify work coordinator
- Frame/assembly of FCAL-II in design stage
- Some details need to be worked out in more detail: Light monitoring system, tungsten absorber in inner region, cooling system