Difference between revisions of "August 8, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
# Installation work: | # Installation work: | ||
#* Mirror studies and water tests (Bill, All) | #* Mirror studies and water tests (Bill, All) | ||
+ | #* Tape (mirror-strongback) in water study (Bill, All) [https://logbooks.jlab.org/entry/3716065 Issue] [https://logbooks.jlab.org/entry/3716588 test] | ||
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | #* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | ||
#* Next steps (All) | #* Next steps (All) |
Revision as of 12:19, 8 August 2019
Meeting Information
GlueX DIRC Meeting
Thursday August 8, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Fall 2019 run delayed: expected to start DIRC commissioning November 25
- Installation work:
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Systematics [Survey vs Momentum Direction Rotation vs G4 Simulation ] (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Commissioning LUT analyses (All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB