Difference between revisions of "August 8, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 26: | Line 26: | ||
#** Cherenkov ring fit (Roman) | #** Cherenkov ring fit (Roman) | ||
#** Cherenkov Systematics (Ahmed) | #** Cherenkov Systematics (Ahmed) | ||
+ | #**[https://halldweb.jlab.org/wiki/images/a/aa/G_commitionning.pdf Survey vs Momentum Direction Rotation Corrections] (Ahmed) | ||
+ | #*[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html Momentum Direction Rotation (Best SPR Method)] | ||
+ | #*[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1] | ||
+ | #*[http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2] | ||
+ | |||
#* Commissioning FastDIRC update (Yunjie) | #* Commissioning FastDIRC update (Yunjie) | ||
# Software/simulations | # Software/simulations |
Revision as of 11:10, 8 August 2019
Meeting Information
GlueX DIRC Meeting
Thursday August 8, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Fall 2019 run delayed: expected to start DIRC commissioning November 25
- Installation work:
- Mirror studies and water tests (Bill, All)
- Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
- Next steps (All)
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Cherenkov Systematics (Ahmed)
- Survey vs Momentum Direction Rotation Corrections (Ahmed)
- Momentum Direction Rotation (Best SPR Method)
- Visualization 1
- Visualization 2
- Commissioning LUT analyses (All)