Difference between revisions of "June 25, 2019 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 25: | Line 25: | ||
#** Water testing results | #** Water testing results | ||
#* Plans for remaining work for installation | #* Plans for remaining work for installation | ||
+ | #** [https://logbooks.jlab.org/entry/3693215 Cleaning mirrors] | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* Reconstruction with FastDIRC (Yunjie) | #* Reconstruction with FastDIRC (Yunjie) |
Revision as of 08:10, 25 June 2019
Meeting Information
GlueX DIRC Meeting
Tuesday June 25, 2019
1:00 pm, EDT
JLab Hall D
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Summer installation work:
- Corrosion with optical box materials and removal
- Steel alignment pins
- Aluminum optical fiber brackets
- LED fiber testing
- Water testing results
- Plans for remaining work for installation
- Corrosion with optical box materials and removal
- Spring 2019 DIRC Commissioning Analysis (All)
- Reconstruction with FastDIRC (Yunjie)
- LUT improvements (Roman)
- Commissioning analyses (Ahmed)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB