Difference between revisions of "Run Planning Meeting Notes, Mar 21 - Mar 27, 2019"
From GlueXWiki
(→Monday, Mar. 25 at 08:45) |
(→Monday, Mar. 25 at 08:45) |
||
Line 50: | Line 50: | ||
#* Ongoing issue with CDC HV readback ([https://logbooks.jlab.org/entry/3670885 logbook entry 3670885]) | #* Ongoing issue with CDC HV readback ([https://logbooks.jlab.org/entry/3670885 logbook entry 3670885]) | ||
#* PS scalers communication issue ([https://logbooks.jlab.org/entry/3670950 logbook entry 3670950]) | #* PS scalers communication issue ([https://logbooks.jlab.org/entry/3670950 logbook entry 3670950]) | ||
− | #* DAQ interruptions ~1 per shift, recovery is straight-forward ([https://logbooks.jlab.org/entry/3671151 | + | #* DAQ interruptions ~1 per shift, recovery is straight-forward ([https://logbooks.jlab.org/entry/3671151], [https://logbooks.jlab.org/entry/3671542]) |
#* Compcal monitoring plots, timing shows double peak | #* Compcal monitoring plots, timing shows double peak | ||
#* Compcal HV communication failure | #* Compcal HV communication failure | ||
− | #* FCal HV communication failure | + | #* FCal HV communication failure ([https://logbooks.jlab.org/entry/3671351 logbook entry 3671351]) |
+ | #* Individual FCal bases need reset ([https://logbooks.jlab.org/entry/3671386 logbook entry 3671386]) | ||
#* FCal fadc scalers stop updating | #* FCal fadc scalers stop updating | ||
#* Accelerator tightens AC lock constraints | #* Accelerator tightens AC lock constraints |
Revision as of 09:35, 25 March 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Mar. 21 at 08:45
- Past 24 hours:
- RF recovery during the day shift
- Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
- Issues
- low counts seen in bcal sector (logbook entry 3670196)
- Reports
- helium target refilled, ready
- trigger rate and beam flux history for Spring 2019 run
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running: when beam returns, check beam conditions as follows:
- do harp scans, both accelerator and Hall D radiator
- check radiation monitor rates in tagger hall and Hall D
- verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Production running: when beam returns, check beam conditions as follows:
Friday, Mar. 22 at 08:45
- Past 24 hours:
- beam recovery, conditions checked, running resumed.
- Issues
- HV tripped on two inner FCal blocks (logbook entry 3670196)
- HV in CDC tripped, without alarm! (logbook entry 3670885)
- Reports
- collimator transmission drops again (logbook entry 3670862)
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
Monday, Mar. 25 at 08:45
- Past 72 hours:
- production running on He target until Sunday 5:30pm
- continued running on empty target through Monday 8:30am
- now in controlled access, RF recovery underway
- Issues
- Ongoing issue with CDC HV readback (logbook entry 3670885)
- PS scalers communication issue (logbook entry 3670950)
- DAQ interruptions ~1 per shift, recovery is straight-forward ([1], [2])
- Compcal monitoring plots, timing shows double peak
- Compcal HV communication failure
- FCal HV communication failure (logbook entry 3671351)
- Individual FCal bases need reset (logbook entry 3671386)
- FCal fadc scalers stop updating
- Accelerator tightens AC lock constraints
- Reports
- Several reference plots for monitoring histograms out of date (logbook entry 3671340)
- Active collimator lock is mostly working, sometimes fights to keep up (logbook entry 3671214)
- Accelerator using machine development time to investigate this effect in Hall D
- Today:
- work on solenoid during 9:00am - 12:00pm, warm-up to begin (logbook entry 3670889)
- accelerator
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday