Difference between revisions of "Run Planning Meeting Notes, Mar 7 - Mar 13, 2019"
From GlueXWiki
(→Wednesday, Mar. 13 at 08:45) |
|||
Line 15: | Line 15: | ||
# Issues | # Issues | ||
# Reports | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3667159 Energy monitoring] (Alexandre) | ||
# Today: | # Today: | ||
#* Production: 200nA, Al 10<sup>-4</sup> | #* Production: 200nA, Al 10<sup>-4</sup> |
Revision as of 08:23, 13 March 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Wednesday, Mar. 13 at 08:45
- Past 24 hours:
- Issues
- Reports
- Energy monitoring (Alexandre)
- Today:
- Production: 200nA, Al 10-4
Tuesday, Mar. 12 at 08:45
- Past 24 hours:
- Rapid access to reboot ComCal HV main frame
- Collimator scan: new AC position -0.1, 0.0 (Hovanes)
- CDC included in read-out, rootspy updated [1]
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
Monday, Mar. 11 at 08:45
- Past 72 hours:
- Beam fully restored on Friday 2pm
- Beam position drifts in y (AC:inner, 5C11B) improved Saturday around noon after extraction lock was set, but still present
- CDC HV turned on Friday evening with nominal HV
- Included in DAQ Saturday, but no-field tracking prevents highlevel monitoring, taken out again
- Fix provided on Sunday (thanks Simon), but rootspy has to be updated
- Trigger studies Saturday evening (Sasha)
- Issues:
- Reports
- Rates after energy change (Alexandre)
- Online monitoring
- Plans:
- Today: Beam studies cancelled
- Tuesday: RF recovery cancelled
- Resume production
- Active collimator scan (Hovanes) and calibration (Richard)?
Friday, Mar. 8 at 08:45
- Past 24 hours:
- Target filled (1h)
- Beam restoration
- Beam convergence
- Issues:
- Reports
- Today (Friday):
- Collimator scan (Hovanes)
- Trigger studies? (Sasha)
- Production: 200nA, Al 10-4
Thursday, Mar. 7 at 08:45
- Past 24 hours:
- Good progress on beam restoration
- Target operation with lHe (C. Keith)
- Issues
- Reports:
- Online monitoring
- Trigger studies (A. Somov)
- Today (Thursday):
- Walk-Through (Elton)
- Lock up (noon?)
- Swing shift on standby
- Accelerator restoration progressing, 11.2GeV beam expected during owl shift
- Beam restoration, step 1 (Hovanes)
- Empty target run?