Line 3: | Line 3: | ||
#* Amorphous radiator ladder by Hovanes and Scot | #* Amorphous radiator ladder by Hovanes and Scot | ||
#* Colin replaced a few bad FCAL bases | #* Colin replaced a few bad FCAL bases | ||
− | #* Sasha checked one noising CompCal channel and found out that it | + | #* Sasha checked one noising CompCal channel and found out that it was caused by the FADC baseline |
# Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382 | # Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382 | ||
# Production trigger rate study was performed by Sasha during afternoon and evening | # Production trigger rate study was performed by Sasha during afternoon and evening |
Revision as of 00:40, 6 December 2018
Wed, Dec 5 at 8:45
- Several items were fixed during a controlled access in the morning
- Amorphous radiator ladder by Hovanes and Scot
- Colin replaced a few bad FCAL bases
- Sasha checked one noising CompCal channel and found out that it was caused by the FADC baseline
- Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382
- Production trigger rate study was performed by Sasha during afternoon and evening
- MCC plan for the coming week
- MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
- On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
- Jay Benesch has initiated a discussion with a group of experts to investigate the feasibility of monitoring 1-2 nA beam current for Hall D.
- Tagger scaler distribution shows that we have beam leakage from Hall C. https://logbooks.jlab.org/entry/3635351