Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2018"
From GlueXWiki
(→Wed, Dec 5 at 8:45) |
(→Wed, Dec 5 at 8:45) |
||
Line 8: | Line 8: | ||
# MCC plan for the coming week | # MCC plan for the coming week | ||
#* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D). | #* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D). | ||
− | #* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will | + | #* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12). |
+ | |||
+ | # Tagger scaler distribution appeared to rise at the high energy end. Richard said that he made some changes this morning and he will take a look at it when he gets chance. |
Revision as of 21:42, 5 December 2018
Wed, Dec 5 at 8:45
- Several items were fixed during a controlled access in the morning
- Amorphous radiator ladder by Hovanes and Scot
- Colin replaced a few bad FCAL bases
- Sasha adjusted CCAL LED trigger time delay
- Production trigger rate study was performed by Sasha during afternoon and evening
- MCC plan for the coming week
- MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
- On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
- Tagger scaler distribution appeared to rise at the high energy end. Richard said that he made some changes this morning and he will take a look at it when he gets chance.