Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(→Wednesday, Nov 28 at 8:45) |
(→Wednesday, Nov 28 at 8:45) |
||
Line 7: | Line 7: | ||
#* Lost beam around 2pm (due to radiation damaged valve position sensor). | #* Lost beam around 2pm (due to radiation damaged valve position sensor). | ||
# FCAL is down: | # FCAL is down: | ||
− | #* [ | + | #* [https://logbooks.jlab.org/entry/3633312 Monitoring current draw on CAN bus] [Matt] |
#* Rapid access is arrange between 10am - noon. | #* Rapid access is arrange between 10am - noon. | ||
# Run Plan: | # Run Plan: |
Revision as of 09:35, 30 November 2018
Wednesday, Nov 28 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Monitoring current draw on CAN bus [Matt]
- Rapid access is arrange between 10am - noon.
- Run Plan:
- Cryo
- solenoid helium fill test this morning