Line 29: | Line 29: | ||
#** Second Energy change will take about 48 hours | #** Second Energy change will take about 48 hours | ||
#** Only Hall B and D at 5 pass: Higher beam currents for D beneficial! | #** Only Hall B and D at 5 pass: Higher beam currents for D beneficial! | ||
+ | #** What are nominal beam conditions?: Current, Radiator, ... | ||
== Monday, Nov 26 at 8:45 == | == Monday, Nov 26 at 8:45 == |
Revision as of 09:26, 28 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Wednesday, Nov 28 at 8:45
- Comp Cal installation
- Survey and positioning repeatability tests
- Detector operations tests!
- Planed close up of hall 3-4pm?
- Run Plan
Monday, Nov 26 at 8:45
- Week End running
- Lumi scan continued and completed Program
- High lumi test done (Sasha)
- DAQ tests done (Sergey)
- Production data taken
- GLUEX E12-06-102 COMPLETE! THANKS TO EVERYBODY!
- Reports:
- Plans This Week
- installation of COMPCAL
- solenod ramp down, off for the remainder of the year
- Detector groups: please decide what to shut down (your call)
- shifts canceled till Thursday morning 8am.
- HallD will use the A-slit (only 3 halls(B,C,D) will be running)
- AOB
Friday, Nov 23 at 10:00
- Its Black Friday!
- Since Wednesday
- Start with luminosity scan (scratched transmission optimization).
- First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
- Continue with data production
- Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
- Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
- generally quite a rocky data taking period.
- general data quality looks reasonable.
- Run Plan
- continue production data taking nominal sequence with nominal beam current
- high luminosity test (red program) when Sasha is available (Friday or Saturday)
- any other requests for studies before beam goes away on Monday morning???
- we do NOT have a low current (50nA) thinnest amo (1e-5)
- AOB