Difference between revisions of "Run Planning Meeting Notes, Nov 21-Nov 28, 2018"
From GlueXWiki
(→Friday, Nov 23 at 10:00) |
|||
Line 30: | Line 30: | ||
#* high luminosity test ([https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529 red program]) when Sasha is available (Friday or Saturday) | #* high luminosity test ([https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529 red program]) when Sasha is available (Friday or Saturday) | ||
#* any other requests for studies before beam goes away on Monday morning??? | #* any other requests for studies before beam goes away on Monday morning??? | ||
+ | #* we do NOT have a low current (50nA) thinnest amo (1e-5) | ||
# AOB | # AOB |
Revision as of 10:33, 23 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Friday, Nov 23 at 10:00
- Its Black Friday!
- Since Wednesday
- Start with luminosity scan (scratched transmission optimization).
- First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
- Continue with data production
- Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
- Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
- generally quite a rocky data taking period.
- general data quality looks reasonable.
- Run Plan
- continue production data taking nominal sequence with nominal beam current
- high luminosity test (red program) when Sasha is available (Friday or Saturday)
- any other requests for studies before beam goes away on Monday morning???
- we do NOT have a low current (50nA) thinnest amo (1e-5)
- AOB